How secure really is a 'secure' data centre? Data centres house the world's information, web pages, financial transactions and social networking. Every data centre needs appropriate levels security commensurate with the data they contain, what is enough security? When planning a new data centre installation, whether a refurbishment or a new build, it is imperative to look at the processes that will be running and the information held BEFORE thinking about trying to design the facility. Most data centre designers will concentrate on power and network resilience and then look at front of house security.
A secure data centre must first and foremost be in the right location. This is not necessarily in close proximity to, or within the head office as is so often the case. When choosing a secure site consideration must be given to resilience. What or who could interrupt service? Is the site on a flood plain, in an area prone to power outages, or in an area where the data centre's presence is, or will become common knowledge. Are there diverse feeds available and are they truly diverse?
What perimeter fencing to you plan to install and what would happen if someone tried to drive through it? Are there separate secure areas for employees and clients to enter and park? Are there any blind spots that a thief or hacker could utilise as cover for entry? Site selection is one of the most important contributing factors to the security of your data centre. If this isn't right security will be compromised from day one. And a final point, do you really need the name of your secure facility emblazoned on the side of the building, or come to that, on your access control cards?
Migration Solutions are vendor independent specialist Data Centre consultants with many years of expertise in designing, building and operating Data Centres. With this knowledge, Migration Solutions provide advice on best security for your facility and help train your staff making your facility as well protected as possible. For more information visit www.migrationsolutions.com or call 0845 251 2255 today.
Showing posts with label computer room. Show all posts
Showing posts with label computer room. Show all posts
Tuesday, 9 February 2010
Wednesday, 14 October 2009
Power saving V's Facility relocation
Power costs in the UK are on the rise, you don't need to be told that. Everyone is feeling the pinch, none more so than the Data Centre industry. Businesses are tightening their belts and reducing staff levels in order to cut costs and stay in business. Data Centre and Computer Room managers are constantly trying to increase efficiency and reduce costs so that they can be competitive in a growing market.
The Invest in Iceland Agency appear to have the answer to everyone's problems. Cheap green power, multi feed connectivity, low building costs and a skilled workforce. It appears to be a no brainer! Power in Iceland costs around 2.1p kW/h for heavy industry where the cheapest rates in the United States are 3.1p and 10.2p in the UK. One of the biggest drains of power in Data Centres is cooling using around 40% of the total power. Fresh air cooling in Iceland solves this problem with the annual temperature not rising above 13ÂșC.
So why is everyone not building Data Centres in Iceland? There is a misconception that latency to Iceland is a hurdle that companies cannot afford to jump. In reality, latency from London to Iceland is half that of London to New York. A more worrying problem is the geomorphology of Iceland. Iceland is geologically, a very young island which has, depending on sources, 18-22 active volcanoes. This would pose a large threat to Data Centres across the island, although the nearest is over 50 miles from the capital, Reykjavik. Earthquakes could also be considered a major problem with Iceland, although they have only recorded 2 major tremors in the past 10 years, compared with Japan which has had more than 10 in the same period. Also, what happens if one of your servers breaks down? Iceland is 2½ hours flight away, not including travelling to and from the airports and getting through security.
So should you relocate to Iceland? It will vary between businesses whether the cost savings are worth the amount of potential downtime from natural events, but if you can, it could be a perfect location for you.
Migration Solutions are a Data Centre consultancy who specialise in Computer Room and Data Centre migration. For more information visit www.migrationsolutions.com or call 0845 251 2255
The Invest in Iceland Agency appear to have the answer to everyone's problems. Cheap green power, multi feed connectivity, low building costs and a skilled workforce. It appears to be a no brainer! Power in Iceland costs around 2.1p kW/h for heavy industry where the cheapest rates in the United States are 3.1p and 10.2p in the UK. One of the biggest drains of power in Data Centres is cooling using around 40% of the total power. Fresh air cooling in Iceland solves this problem with the annual temperature not rising above 13ÂșC.
So why is everyone not building Data Centres in Iceland? There is a misconception that latency to Iceland is a hurdle that companies cannot afford to jump. In reality, latency from London to Iceland is half that of London to New York. A more worrying problem is the geomorphology of Iceland. Iceland is geologically, a very young island which has, depending on sources, 18-22 active volcanoes. This would pose a large threat to Data Centres across the island, although the nearest is over 50 miles from the capital, Reykjavik. Earthquakes could also be considered a major problem with Iceland, although they have only recorded 2 major tremors in the past 10 years, compared with Japan which has had more than 10 in the same period. Also, what happens if one of your servers breaks down? Iceland is 2½ hours flight away, not including travelling to and from the airports and getting through security.
So should you relocate to Iceland? It will vary between businesses whether the cost savings are worth the amount of potential downtime from natural events, but if you can, it could be a perfect location for you.
Migration Solutions are a Data Centre consultancy who specialise in Computer Room and Data Centre migration. For more information visit www.migrationsolutions.com or call 0845 251 2255
Labels:
computer room,
cooling,
Data Centre,
free cooling,
iceland,
migration
Friday, 9 October 2009
Sun to run your Sun Servers?
This blog has looked at renewable energy for Data Centres and Computer Rooms before, but an increasing amount of information is surfacing that suggests that, without any further improvement, the payback on solar panels does not make it cost effective.
Toyota have an office in California which, since 2003 has relied on the sun for 20% of its power requirements. Now we all know California is a sunny place; it enjoys on average, 263 days of strong sunlight a year, but what is the payback of their installation?
Toyota have 54,000 sq ft of solar panels on their office in Torrance which are rated at 536 kW in total. Southern California has an insolation value of between 4-5.5 depending on the source. Taking the maximum figure, that each m2 of solar panels generates 550 watts per day, we can presume that their panels generate £331 of equivalent grid power every day, or £120,810 a year. The solar panels cost Toyota $3 million, half of which was paid by the government in tax credits. Ignoring the tax credits as they vary from country to country, and including the need to replace the inverters every 12½ years (at a $240,000 cost!) payback on these panels would be 17¼ years, and after that they would save Toyota £108,785 a year off a £543,925 electricity bill, or around 20%.
What relevance is this to the UK I hear you scream? The same set-up in the London would take 157 years! By this time, the technology would become defunct and replaced by more efficient systems. For now I think we are safe using mains power until a more efficient method of power generation can be found!
Migration Solutions are a specialist Data Centre consultancy who are fiercely vendor independent. They created ERA, and Environmental Report and Assessment to take a snap shot of a facility and suggest ways to improve its efficiency and save on running costs. Information Age presented Migration Solutions with the 'Data Centre Innovation' award for this product. For more information visit www.migrationsolutions.com or call 0845 251 2255
Toyota have an office in California which, since 2003 has relied on the sun for 20% of its power requirements. Now we all know California is a sunny place; it enjoys on average, 263 days of strong sunlight a year, but what is the payback of their installation?
Toyota have 54,000 sq ft of solar panels on their office in Torrance which are rated at 536 kW in total. Southern California has an insolation value of between 4-5.5 depending on the source. Taking the maximum figure, that each m2 of solar panels generates 550 watts per day, we can presume that their panels generate £331 of equivalent grid power every day, or £120,810 a year. The solar panels cost Toyota $3 million, half of which was paid by the government in tax credits. Ignoring the tax credits as they vary from country to country, and including the need to replace the inverters every 12½ years (at a $240,000 cost!) payback on these panels would be 17¼ years, and after that they would save Toyota £108,785 a year off a £543,925 electricity bill, or around 20%.
What relevance is this to the UK I hear you scream? The same set-up in the London would take 157 years! By this time, the technology would become defunct and replaced by more efficient systems. For now I think we are safe using mains power until a more efficient method of power generation can be found!
Migration Solutions are a specialist Data Centre consultancy who are fiercely vendor independent. They created ERA, and Environmental Report and Assessment to take a snap shot of a facility and suggest ways to improve its efficiency and save on running costs. Information Age presented Migration Solutions with the 'Data Centre Innovation' award for this product. For more information visit www.migrationsolutions.com or call 0845 251 2255
Labels:
computer room,
Data Centre,
Migration Solutions,
Solar,
sun
Thursday, 13 August 2009
Web Security
Twitter, the hugely popular blogging site fell under another attack from hackers again on Tuesday night. The 30 minute outage has not had a cause linked with it yet, but many people feel that it could be related to an account hack last week. This is not the first time that Twitter has had security issues. In January, 33 accounts were hacked into, including the US President Barack Obama, gaining access to the administrators secure area where they made changes including changing email addresses and leaving messages.
The attacks on Twitter have highlighted the need for careful security at server and software level to protect private information. Since the internet went live, hackers from all over the world have been breaking into websites and breaching security whether it be with malicious intent or just for fun. No level of security is immune from these virtual threats and this has been exemplified by Gary McKinnon from the UK who managed to hack into the United States military computer system, allegedly in search of information about UFO's.
Companies spend thousands of pounds protecting their computer systems from hackers and viruses, but Data Centres are often a major weak point in IT security. Data Centres and Computer Rooms throughout the country lack the physical security that their servers virtually uphold. How many times have you held the door for someone else to enter a facility? Did you check whether they should have had access? How often is your loading bay door left open or secure doors propped open while you 'carry a box through'? In Migration Solutions experience, it is often too easy to enter a Data Centre through the back door and get someone to let you into the live floor without a pass or signing in.
It is not just having the physical security that needs to be addressed. Staff need the training to ensure that they don't let people through, that they follow procedures and maintain the security levels that your facility requires. Regular staff training can vastly improve your Computer Room or Data Centres security and maximise the potential of the the security measures, physical and virtual, that you have in place.
Migration Solutions are specialist Data Centre consultants with many years of expertise in both building and operating Data Centres. With this combined knowledge, they can advise you on the best security systems for your facility and help train your staff so that you can be as well protected as possible. For more information visit www.migrationsolutions.com or call 0845 251 2255 today.
The attacks on Twitter have highlighted the need for careful security at server and software level to protect private information. Since the internet went live, hackers from all over the world have been breaking into websites and breaching security whether it be with malicious intent or just for fun. No level of security is immune from these virtual threats and this has been exemplified by Gary McKinnon from the UK who managed to hack into the United States military computer system, allegedly in search of information about UFO's.
Companies spend thousands of pounds protecting their computer systems from hackers and viruses, but Data Centres are often a major weak point in IT security. Data Centres and Computer Rooms throughout the country lack the physical security that their servers virtually uphold. How many times have you held the door for someone else to enter a facility? Did you check whether they should have had access? How often is your loading bay door left open or secure doors propped open while you 'carry a box through'? In Migration Solutions experience, it is often too easy to enter a Data Centre through the back door and get someone to let you into the live floor without a pass or signing in.
It is not just having the physical security that needs to be addressed. Staff need the training to ensure that they don't let people through, that they follow procedures and maintain the security levels that your facility requires. Regular staff training can vastly improve your Computer Room or Data Centres security and maximise the potential of the the security measures, physical and virtual, that you have in place.
Migration Solutions are specialist Data Centre consultants with many years of expertise in both building and operating Data Centres. With this combined knowledge, they can advise you on the best security systems for your facility and help train your staff so that you can be as well protected as possible. For more information visit www.migrationsolutions.com or call 0845 251 2255 today.
Labels:
computer room,
Data Centre,
firewall,
security
Friday, 7 August 2009
Connection Security
How resilient is your Data Centre? How many fibre feeds does it have and where do these feeds come from? In the news recently was a story about the majority of west Africa being cut off from the internet due to a fault in the cable that runs from Portugal and Spain to South Africa via west Africa. The initial reports suggest that 70% of Nigeria have had their bandwidth cut as the remaining 30% takes up the load. Some may view this as a good thing as those pesky Nigerians who want to transfer millions of $ into our accounts so they can make themselves and us money, will not be able to send out any more emails! On a serious note, the bandwidth blackout has had a major effect on the government, banking sectors and the mobile phone networks. The lack of communication has left the country struggling to maintain normal activity.
Does your facility have diverse feeds? Do you know the routes these diverse feeds take? It is all very well having a resilient facility that has multiple feeds, but if both feeds exit the premises together, or at any point on their journey follow the same path, there is a large point of weakness to the connectivity of your Data Centre. With the country's infrastructure being dug up over and over again as water mains burst, sewers get clogged and broadband improved, there is increasing risk of damage to the fibre optics that service your facility. Being prepared and looking into having true diverse power and connectivity feeds into your Data Centre or Computer Room is a must for any business that relies on 24/7 connectivity.
Migration Solutions are a specialist Data Centre consultancy focusing on design, build, operation and migration of facilities throughout the UK and Europe. Contact us now for advice on how to make your Data Centre or Computer Room more resilient at www.migrationsolutions.com
Does your facility have diverse feeds? Do you know the routes these diverse feeds take? It is all very well having a resilient facility that has multiple feeds, but if both feeds exit the premises together, or at any point on their journey follow the same path, there is a large point of weakness to the connectivity of your Data Centre. With the country's infrastructure being dug up over and over again as water mains burst, sewers get clogged and broadband improved, there is increasing risk of damage to the fibre optics that service your facility. Being prepared and looking into having true diverse power and connectivity feeds into your Data Centre or Computer Room is a must for any business that relies on 24/7 connectivity.
Migration Solutions are a specialist Data Centre consultancy focusing on design, build, operation and migration of facilities throughout the UK and Europe. Contact us now for advice on how to make your Data Centre or Computer Room more resilient at www.migrationsolutions.com
Labels:
computer room,
Data Centre,
feeds,
fibre,
resiliant
Wednesday, 5 August 2009
Green Repercussions
The EAC (Environmental Audit Committee) has commented today that they believe that if government departments fail to cut their carbon emissions in line with their Carbon Reduction Commitment (CRC) plan, that the taxpayers will have to pick up the bill. The CRC plan charges companies £12 per tonne of CO2 they release or expect to release in a year. Using energy saving technology to reduce emissions and increase efficiency will allow companies to be ranked on percentage of CO2 reduced and will then be given a rebate if they succeed or exceed the 12.5% reduction by 2012.
The government's plan is to give companies an incentive to reduce energy consumption and they expect the savings to more than pay for the £12 charge, making a net gain for the businesses involved. The EAC are suggesting that this plan could come back to bite the government if they cannot achieve their own targets, meaning the government would have to take money out of the national budget to pay for their own shortcomings.
There are widespread worries that a 12.5% reduction in CO2 emissions will be hard to attain for many companies.
In the words of Lance-Corporal Jack Jones "DON'T PANIC"!! This is far from a bad thing for Data Centres. As we all know, Data Centres consume around 3-4% of all power in the UK. 12.5% of this equates to the equivalent of a 200MW facility!
Reducing every Data Centre and Computer Rooms power consumption by 12.5% may sound like an impossible challenge, but in reality it can be a very simple to achieve.
Migration Solutions developed ERA (Environmental Report and Assessment) which concentrates on all aspects that affect the running of a Data Centre or Computer Room and advises clients on how to improve their efficiency and as a result, reduce their power consumption and costs. Using the advice provided by Migration Solutions, estimated savings that will be free to implement could save between 5-10% of your facilities power costs. With a small amount of expenditure you could expect to see a reduction of 12-20% in power consumption. So the CRC may not be as hard to fulfil as you may first think! For more information visit www.migrationsolutions.com or call 0845 251 2255
The government's plan is to give companies an incentive to reduce energy consumption and they expect the savings to more than pay for the £12 charge, making a net gain for the businesses involved. The EAC are suggesting that this plan could come back to bite the government if they cannot achieve their own targets, meaning the government would have to take money out of the national budget to pay for their own shortcomings.
There are widespread worries that a 12.5% reduction in CO2 emissions will be hard to attain for many companies.
In the words of Lance-Corporal Jack Jones "DON'T PANIC"!! This is far from a bad thing for Data Centres. As we all know, Data Centres consume around 3-4% of all power in the UK. 12.5% of this equates to the equivalent of a 200MW facility!
Reducing every Data Centre and Computer Rooms power consumption by 12.5% may sound like an impossible challenge, but in reality it can be a very simple to achieve.
Migration Solutions developed ERA (Environmental Report and Assessment) which concentrates on all aspects that affect the running of a Data Centre or Computer Room and advises clients on how to improve their efficiency and as a result, reduce their power consumption and costs. Using the advice provided by Migration Solutions, estimated savings that will be free to implement could save between 5-10% of your facilities power costs. With a small amount of expenditure you could expect to see a reduction of 12-20% in power consumption. So the CRC may not be as hard to fulfil as you may first think! For more information visit www.migrationsolutions.com or call 0845 251 2255
Labels:
computer room,
Data Centre,
Environment,
ERA,
power
Tuesday, 28 July 2009
Broadband Bashing
ISP's (Internet Service Providers) are in trouble again after the release of Ofcom's latest report. There has been extended debate about the legalities and honesty of ISP's 'up to' speed clause in their bandwidth package, because the majority of customers do not and cannot attain the speeds suggested by them.
The Ofcom report focused on the 8Mb service provided by ISP's across the country. Their findings revealed that only 9% of users who subscribe to an 8mb service could attain above 6Mb and that the majority of users could get less than half the quoted amount. The ISP's argue that customers within a close proximity to the telephone exchange attain close to the quoted bandwidth speeds and because of distance and drain on the service by other users, customers who are further out get a slower service. Ofcom also revealed that the majority of 8mb connections could not even support 8Mb, and actually only had the capacity for 7.1Mb.
While the rest of the country has to abide by advertising laws and provide the customer exactly what they offer, ISP's have the ability to suggest that you will receive a service that they cannot provide. The two words 'up to' are an unfair loophole for consumers considering that the majority of customers are not getting the advertised amount. The issue that Ofcom is attempting to solve is to allow the public to get broadband connections that are consistent and that can be regulated. If companies are willing to install the infrastructure to support fast internet speeds such as ADSL MAX or fibre, then they should be allowed to advertise its availability - but not before the service is available.
So what does this report hope to achieve? The government wants the ISP's to be honest about the service they provide so that they can reach their target of the whole country having a minimum of 2Mb internet speeds. If the report has the desired effect, ISPs will have to improve their infrastructure and improve their service, which allows the public to receive what they pay for and not a substandard service.
The result of increasing internet speeds across the country will be a larger demand for Data Centre space, as people access websites, store information and extend their dependency on online services. The competition will increase speeds and drive down prices which will make Data Centre space more affordable and desirable. Migration Solutions are data centre specialists who focus on the operation, migration and design of new and existing data centres. They are vendor independent which allows the best products to be selected for their clients. To find out about what Migration Solutions can do for you visit the website www.migrationsolutions.com
The Ofcom report focused on the 8Mb service provided by ISP's across the country. Their findings revealed that only 9% of users who subscribe to an 8mb service could attain above 6Mb and that the majority of users could get less than half the quoted amount. The ISP's argue that customers within a close proximity to the telephone exchange attain close to the quoted bandwidth speeds and because of distance and drain on the service by other users, customers who are further out get a slower service. Ofcom also revealed that the majority of 8mb connections could not even support 8Mb, and actually only had the capacity for 7.1Mb.
While the rest of the country has to abide by advertising laws and provide the customer exactly what they offer, ISP's have the ability to suggest that you will receive a service that they cannot provide. The two words 'up to' are an unfair loophole for consumers considering that the majority of customers are not getting the advertised amount. The issue that Ofcom is attempting to solve is to allow the public to get broadband connections that are consistent and that can be regulated. If companies are willing to install the infrastructure to support fast internet speeds such as ADSL MAX or fibre, then they should be allowed to advertise its availability - but not before the service is available.
So what does this report hope to achieve? The government wants the ISP's to be honest about the service they provide so that they can reach their target of the whole country having a minimum of 2Mb internet speeds. If the report has the desired effect, ISPs will have to improve their infrastructure and improve their service, which allows the public to receive what they pay for and not a substandard service.
The result of increasing internet speeds across the country will be a larger demand for Data Centre space, as people access websites, store information and extend their dependency on online services. The competition will increase speeds and drive down prices which will make Data Centre space more affordable and desirable. Migration Solutions are data centre specialists who focus on the operation, migration and design of new and existing data centres. They are vendor independent which allows the best products to be selected for their clients. To find out about what Migration Solutions can do for you visit the website www.migrationsolutions.com
Labels:
computer room,
Data Centre,
internet,
ofcom
Friday, 24 July 2009
Is a wireless Data Centre possible?
Does your Data Centre look like this?The majority of Data Centres and Computer Rooms in the UK have disorganised cabling and patching which inhibits air flow and reduces efficiency. The organic nature of a network infrastructure often starts with the best intentions and neat cabling, but develops into a sprawling mess when 'quick patches' are made and then left in position. Five years down the line and you can't see the rear of your servers!
There are so many benefits to a neatly patched facility. Connecting your servers through a patch panel allows quick organised alterations to the network while maintaining sub-floor cabling and air flows through the Data Centre. Using cable management arms inside cabinets keeps all cables neatly together and easily traceable, and allows hot air to exit quickly and unobstructed from the servers, which reduces the need for the computer fans to work as hard, reducing power usage. But could we do away with cabling all together?
Companies like WiTricity are already researching safe, wireless power transfers with the idea that in the future, you will be able to walk into a room or your office and phones, laptops and and mp3 players will start charging automatically without being connected to anything. The potential for this technology is unlimited, giving true freedom for you and your gadgets. But what about Data Centres and Computer Rooms? If the same technology was applied, power cables could be removed which would improve air flows and therefore cooling efficiency. The question remains though, would the amount of power required be able to be safely transferred to the equipment reliably? And, more importantly, being only around 40% efficient vast improvements will have to be made to make it a viable solution in a Data Centre environment.
So if wireless power is a possibility, what about wireless networking? Cisco are currently operating and improving a wireless Data Centre. Their facility uses Power over Ethernet and Wi-Fi Ethernet to create a network cable free Data Centre. They have up to 27 routers in the ceiling per meter to give excellent redundancy and bandwidth levels. This technology, along with wireless monitoring and management like the service provided by Synapsense would create a true, wireless Data Centre. Synapsense gives an on-demand picture of temperatures, humidities and pressures within a facility which could replace an expensive and often in accurate CFD (Computational Fluid Dynamics) test.
While CFD has its place, it lacks the ability to map each individual facilities server utilisation. This new method would allow a Data Centre Manager to fine tune a facility so that servers are always in the most efficient area. With the ability to move servers and racks around freely to optimise cooling, with the only constraint being floor grill placement, super efficient data centres could be just around the corner and they could, just possibly be wireless!
Migration Solutions is a member of The Green Grid which is focused on advancing efficiency in Data Centres. They have also recently received Information Age's award for Best Data Centre Innovation for ERA - an Environmental Report and Audit which aims to help data centre owners to save money and the environment with no or little financial outlay.
Labels:
computer room,
network,
power,
wi-fi,
wireless
Wednesday, 22 July 2009
Power to the People
Have you got power? Do you know where your power comes from? How long can you survive without power? Many companies in Kent are asking these questions as they face a third day without electricity. Up to 100,000 homes and businesses have been left without power after a suspected vandal attack on an electricity substation in Dartford. Many businesses have had to close as they cannot function without power and only facilities with backup power generation have been able to continue their operations as usual.
For those who need to keep their businesses going, there has been a huge demand for generators and fuel. EDF who own the substation have been trying to restore power and have been providing backup power in 3 hour long, rotated sessions where possible. A number of Data Centres in the area who do not have generators on site have been paying higher than usual prices to source power at short notice. They are starting to realise how fragile the national grid is in the UK and how there is an increasing need for standby generators with present and expected, future power problems.
So do you know where your Data Centre gets its power? Do you have diverse feeds to maintain resilience? In a worst case scenario, how long could your facility survive without mains power and without generator fuel? For the majority of Data Centres with standby generators, no more than 24 hours worth of fuel is kept on site. According to the Uptime Institutes tiering standards, a tier 4 facility is only required to have 4 days of fuel while a Tier 3 only 3. What happens if fuel trucks cannot get to your facility to refill the tanks? Some Data Centres claim to hold enough fuel for 90 days of normal operation. This may seem very expensive and sound like overkill, but talks of London running out of power in the near future and past fuel price strikes are leading business continuity experts to recommend larger fuel tanks to minimise potential impact on critical business systems. How vital are your systems and how long could your facility survive?
Migration Solutions are a specialist Data Centre consultancy focusing on design, build, operation and migration of facilities throughout the UK and Europe. Contact us now for advice on how to make your Data Centre or Computer Room more resilient for the future at www.migrationsolutions.com
For those who need to keep their businesses going, there has been a huge demand for generators and fuel. EDF who own the substation have been trying to restore power and have been providing backup power in 3 hour long, rotated sessions where possible. A number of Data Centres in the area who do not have generators on site have been paying higher than usual prices to source power at short notice. They are starting to realise how fragile the national grid is in the UK and how there is an increasing need for standby generators with present and expected, future power problems.
So do you know where your Data Centre gets its power? Do you have diverse feeds to maintain resilience? In a worst case scenario, how long could your facility survive without mains power and without generator fuel? For the majority of Data Centres with standby generators, no more than 24 hours worth of fuel is kept on site. According to the Uptime Institutes tiering standards, a tier 4 facility is only required to have 4 days of fuel while a Tier 3 only 3. What happens if fuel trucks cannot get to your facility to refill the tanks? Some Data Centres claim to hold enough fuel for 90 days of normal operation. This may seem very expensive and sound like overkill, but talks of London running out of power in the near future and past fuel price strikes are leading business continuity experts to recommend larger fuel tanks to minimise potential impact on critical business systems. How vital are your systems and how long could your facility survive?
Migration Solutions are a specialist Data Centre consultancy focusing on design, build, operation and migration of facilities throughout the UK and Europe. Contact us now for advice on how to make your Data Centre or Computer Room more resilient for the future at www.migrationsolutions.com
Labels:
computer room,
Data Centre,
failure,
generation,
generator,
power,
resiliant
Monday, 6 July 2009
Super-Data Centres
Has anyone got a spare million lying around? How about cheeky $2 billion?
The NSA (National Security Agency) in America, has announced plans that they intend to build a $2 billion, 1 million sq ft data centre in Utah as they are fast growing out of their Fort Meade headquarters. The proposed 65 MW facility will be sited on 2 major power corridors and will house new supercomputers that the Fort Meade facility can no longer support. The NSA, who watch and listen to most communications - via the internet, phone calls, radio broadcasting and other communications methods. They watch over the whole world's communications, attempting to spot dangers to the USA from foreigners. An element of this information is shared with GCHQ, the UK's version of the NSA. The NSA build bespoke supercomputers to break ciphers and encryption around the world, which require huge amounts of power and cooling to operate effectively. As an example, the world's most powerful supercomputer, the IBM Roadrunner takes up 296, 42U racks and uses 2.53MW of power, not including the water-cooled CRAC units.
In the UK we can presume that GCHQ must have a similar sized computing capacity. There is not much information as you would expect from a highly classified branch of the government, but they have stated that “It’s hard for an outsider to imagine the immense size and sheer power of GCHQ’s supercomputing architecture.” This does beg the question, does the government/GCHQ have access to vast amounts of power that is not readily available to the public and average data centre operator. There is a severe shortage of power in the UK which has been highlighted through the reserving of electricity for the Olympics by many companies who have been paying vast sums of money in a bidding war to secure the limited power available. The government has a plan in place to build a number of new nuclear power stations and clean coal powered stations (which will include carbon capture) by 2018, but many sources are saying that the UK will run out of power by 2015 as old power stations come to the end of their lives.
The best way to safeguard your data centre or computer room for the future is to make it more efficient now so that you will not require excessive power in the next 10 years. Migration Solutions are specialist Data Centre consultants who design and build, operate and migrate data centres all over the UK and Europe and have recently won Information Age's Data Centre Innovation award for ERA, an Environmental Report and Assessment which looks at ways that computer room and data centre operators can cut costs and improve their facilities efficiency. For more information visit www.migrationsolutions.com or call 0845 251 2255.
The NSA (National Security Agency) in America, has announced plans that they intend to build a $2 billion, 1 million sq ft data centre in Utah as they are fast growing out of their Fort Meade headquarters. The proposed 65 MW facility will be sited on 2 major power corridors and will house new supercomputers that the Fort Meade facility can no longer support. The NSA, who watch and listen to most communications - via the internet, phone calls, radio broadcasting and other communications methods. They watch over the whole world's communications, attempting to spot dangers to the USA from foreigners. An element of this information is shared with GCHQ, the UK's version of the NSA. The NSA build bespoke supercomputers to break ciphers and encryption around the world, which require huge amounts of power and cooling to operate effectively. As an example, the world's most powerful supercomputer, the IBM Roadrunner takes up 296, 42U racks and uses 2.53MW of power, not including the water-cooled CRAC units.
In the UK we can presume that GCHQ must have a similar sized computing capacity. There is not much information as you would expect from a highly classified branch of the government, but they have stated that “It’s hard for an outsider to imagine the immense size and sheer power of GCHQ’s supercomputing architecture.” This does beg the question, does the government/GCHQ have access to vast amounts of power that is not readily available to the public and average data centre operator. There is a severe shortage of power in the UK which has been highlighted through the reserving of electricity for the Olympics by many companies who have been paying vast sums of money in a bidding war to secure the limited power available. The government has a plan in place to build a number of new nuclear power stations and clean coal powered stations (which will include carbon capture) by 2018, but many sources are saying that the UK will run out of power by 2015 as old power stations come to the end of their lives.
The best way to safeguard your data centre or computer room for the future is to make it more efficient now so that you will not require excessive power in the next 10 years. Migration Solutions are specialist Data Centre consultants who design and build, operate and migrate data centres all over the UK and Europe and have recently won Information Age's Data Centre Innovation award for ERA, an Environmental Report and Assessment which looks at ways that computer room and data centre operators can cut costs and improve their facilities efficiency. For more information visit www.migrationsolutions.com or call 0845 251 2255.
Labels:
computer room,
Data Centre,
efficiency,
Nuclear,
power
Tuesday, 30 June 2009
Heatwave!
As you may be able to tell there is a heat wave happening in the UK! Throughout this week the temperatures will be increasing reaching a peak on Thursday. The Met Office has issued a Level 2 Heat-Health warning to prepare the public for the weather. While the temperatures may not be high compared to many places around the world, the UK is used to a more moderate heat and infrastructures are designed with this in mind.
Older data centres and computer rooms often start to overheat and fail in high temperatures, as the air conditioning struggles to cope with the increased heat levels and cooling. These facilities are also likely to be full to capacity. In a facility that is already on the limit of cooling, a heat wave becomes very dangerous, especially if a CRAC Unit (Computer Room Air Conditioning) were to fail. Old servers are also very sensitive to fluctuations in temperature. Increased heat requires the internal fans to spin faster to cool the equipment and if a fan stops working, a server can very quickly over heat and shut down. If any 1 server has business critical applications on it, you should be prepared.
Migration Solutions created a health check for data centres and computer rooms which looks at all aspects of a facility and gives it a scored rating. The ERA report comes with an entire section on improvements that can be made to help your Data Centre run more efficiently and effectively, and can identify possible problems that could result in down time. These improvements range from free, low man-time changes that can yield a 5-10% reduction in power costs to major works which include changing a facility layout, rack layout and replacing old plant equipment. An essential part of Data Centre management is preparing for the worst, and identifying the strengths and weakness of your facility is key. For more information on the Environmental Report and Assessment visit www.migrationsolutions.com.
Older data centres and computer rooms often start to overheat and fail in high temperatures, as the air conditioning struggles to cope with the increased heat levels and cooling. These facilities are also likely to be full to capacity. In a facility that is already on the limit of cooling, a heat wave becomes very dangerous, especially if a CRAC Unit (Computer Room Air Conditioning) were to fail. Old servers are also very sensitive to fluctuations in temperature. Increased heat requires the internal fans to spin faster to cool the equipment and if a fan stops working, a server can very quickly over heat and shut down. If any 1 server has business critical applications on it, you should be prepared.
Migration Solutions created a health check for data centres and computer rooms which looks at all aspects of a facility and gives it a scored rating. The ERA report comes with an entire section on improvements that can be made to help your Data Centre run more efficiently and effectively, and can identify possible problems that could result in down time. These improvements range from free, low man-time changes that can yield a 5-10% reduction in power costs to major works which include changing a facility layout, rack layout and replacing old plant equipment. An essential part of Data Centre management is preparing for the worst, and identifying the strengths and weakness of your facility is key. For more information on the Environmental Report and Assessment visit www.migrationsolutions.com.
Labels:
air conditioning,
computer room,
cooling,
Data Centre,
heatwave,
Over heating,
overheating
Tuesday, 2 June 2009
Refurbishment vs. New facilities
Whenever there is a hot summer, old and some not to old data centres and computer rooms suffer. As they overheat due to inefficiencies and under-cooling, management must decide whether it is more cost effective to patch the room up to last another year, to totally refurbish the computer room or to build a brand new computer room or data centre from scratch. This summer is likely to be no different with many people expecting some record temperatures.
The task of persuading the powers that be to choose one of these options lies with the facilities and operations departments explaining the viability of each choice to the finance director. It has been said before that facilities and operations rarely see eye to eye, often due to the differing natures of their jobs, so the management team rarely get an unbiased view of the true needs of the IT department. So what are the benefits of refurbishing a data centre vs. building a new facility and vice versa?
Refurbishment
When refurbishing a facility there is one major problem that stands in the way; working around live equipment, be it plant or servers. Maintaining 24/7 operations during a refurbishment is possible, but special care needs to be taken by all parties working in close proximity to the facility. As workmen connect and test new plant, short circuits and power failures are a common hazard, as are people tripping over live cables and lifted floor tiles that span work areas.
In choosing a refurbishment, there are many areas in which budget can be saved when compared to a new build. Starting from scratch requires foundations, walls being built and services being connected, all of which may be avoided in a refurbishment saving time and money. The site will often be in, or close to the main office which appeals to many companies and IT departments and this also means it may be possible to reuse plant from the old facility.
New
Many computer rooms and data centres have evolved over time to become the backbone of company operations, but often, this Darwinist approach to IT results in a room that is the wrong shape, size and layout for modern computer equipment and the installed plant often struggles to cope with advances in computer power. Building a new computer room or data centre provides the ability of hindsight to prevent the same problems happening again, by future proofing the new facility from its outset.
A new data centre will be specifically designed for the businesses needs. Building from maximises the efficiencies of new technologies such as free and fresh air cooling, heat re-use and dust reduction. By designing a new facility, the ability to include de-box and test rooms adjacent to the computer room or data centre, secure delivery bays and single level entry to the finished floor level helps to maintain the operation of an efficient data centre. A problem that often arises from a refurbishment is that IT staffs still see it as the old facility and fall into bad habits that encourage poor patching which reduces airflows; poor housekeeping that increases dust levels; and poor security to name a few. A new facility is often treated like a new car; you want it looking like that day you took ownership for as long as possible so staffs try especially hard to maintain its high standards. By moving data over to a totally new facility you can start afresh and help maintain a reliable, efficient computer room or data centre for many years to come.
Every case is different and Migration Solutions are experts at recommending the most suitable options for each client. Migration Solutions has many years of experience in computer room and data centre design and construction utilising their operational experience to create a data centre that runs as efficiently as possible, but is also easy to use for the operations team. For more information visit www.migrationsolutions.com
The task of persuading the powers that be to choose one of these options lies with the facilities and operations departments explaining the viability of each choice to the finance director. It has been said before that facilities and operations rarely see eye to eye, often due to the differing natures of their jobs, so the management team rarely get an unbiased view of the true needs of the IT department. So what are the benefits of refurbishing a data centre vs. building a new facility and vice versa?
Refurbishment
When refurbishing a facility there is one major problem that stands in the way; working around live equipment, be it plant or servers. Maintaining 24/7 operations during a refurbishment is possible, but special care needs to be taken by all parties working in close proximity to the facility. As workmen connect and test new plant, short circuits and power failures are a common hazard, as are people tripping over live cables and lifted floor tiles that span work areas.
In choosing a refurbishment, there are many areas in which budget can be saved when compared to a new build. Starting from scratch requires foundations, walls being built and services being connected, all of which may be avoided in a refurbishment saving time and money. The site will often be in, or close to the main office which appeals to many companies and IT departments and this also means it may be possible to reuse plant from the old facility.
New
Many computer rooms and data centres have evolved over time to become the backbone of company operations, but often, this Darwinist approach to IT results in a room that is the wrong shape, size and layout for modern computer equipment and the installed plant often struggles to cope with advances in computer power. Building a new computer room or data centre provides the ability of hindsight to prevent the same problems happening again, by future proofing the new facility from its outset.
A new data centre will be specifically designed for the businesses needs. Building from maximises the efficiencies of new technologies such as free and fresh air cooling, heat re-use and dust reduction. By designing a new facility, the ability to include de-box and test rooms adjacent to the computer room or data centre, secure delivery bays and single level entry to the finished floor level helps to maintain the operation of an efficient data centre. A problem that often arises from a refurbishment is that IT staffs still see it as the old facility and fall into bad habits that encourage poor patching which reduces airflows; poor housekeeping that increases dust levels; and poor security to name a few. A new facility is often treated like a new car; you want it looking like that day you took ownership for as long as possible so staffs try especially hard to maintain its high standards. By moving data over to a totally new facility you can start afresh and help maintain a reliable, efficient computer room or data centre for many years to come.
Every case is different and Migration Solutions are experts at recommending the most suitable options for each client. Migration Solutions has many years of experience in computer room and data centre design and construction utilising their operational experience to create a data centre that runs as efficiently as possible, but is also easy to use for the operations team. For more information visit www.migrationsolutions.com
Labels:
autoCAD,
build,
computer room,
cooling,
Data Centre,
design,
new,
overheating,
refurbishment
Friday, 24 April 2009
Major move to Outsourcing - but is it right?
According to an article published on Kabelnet, there will be a major move to outsource services caused by the current financial crisis ‘to save money’. The author, Tony Travers, says if attempts by some councils to outsource large parts of their functions succeed, "almost every authority in the country will be inexorably pulled" towards this model.
The reason for the outsourcing appears to be about saving money, and that it will involve different organisations – mainly in the public sector, such as primary care trusts, and police forces.
But is outsourcing the right thing to do?
It depends. It is essential to get professional advice. There’s more to it than just the cost. Consider the data you hold, look at the security implications and remember, there is no such thing as 'one size fits all'. All hosting and coloctation facilities are different - offering differing levels of security, service and provision.
In our experience, refurbishing an existing facility, or converting existing rooms or buildings into a new computer room will have a payback time (ROI) of less than 7 years. That may be too long in the current climate, but it must be considered.
Outsourcing to a co-location provider can’t be an abdication of responsibility for the security of the data being held off site. It may seem like the easy option but outsourcing a computer room facility has other challenges that must be carefully considered.
This having been said, moving to a well run, secure, hosted data centre facility is right for some businesses. Using an experienced specialist company to provide an independent assessment of the business need is essential in making the right decision.
Whether you are a customer considering outsourcing to a hosting or colocation company, or you are a hosting or colocation company hoping to secure a deal, it is essential that you use independent specialist advice to help you make the right decision. Whether customer or provider, you are essentially about to enter into a 'marriage' and it is important that you are right for each other!
Migration Solutions is a vendor independent computer room and data centre specialist company. Take a look at our website at http://www.migrationsolutions.com/
The reason for the outsourcing appears to be about saving money, and that it will involve different organisations – mainly in the public sector, such as primary care trusts, and police forces.
But is outsourcing the right thing to do?
It depends. It is essential to get professional advice. There’s more to it than just the cost. Consider the data you hold, look at the security implications and remember, there is no such thing as 'one size fits all'. All hosting and coloctation facilities are different - offering differing levels of security, service and provision.
In our experience, refurbishing an existing facility, or converting existing rooms or buildings into a new computer room will have a payback time (ROI) of less than 7 years. That may be too long in the current climate, but it must be considered.
Outsourcing to a co-location provider can’t be an abdication of responsibility for the security of the data being held off site. It may seem like the easy option but outsourcing a computer room facility has other challenges that must be carefully considered.
This having been said, moving to a well run, secure, hosted data centre facility is right for some businesses. Using an experienced specialist company to provide an independent assessment of the business need is essential in making the right decision.
Whether you are a customer considering outsourcing to a hosting or colocation company, or you are a hosting or colocation company hoping to secure a deal, it is essential that you use independent specialist advice to help you make the right decision. Whether customer or provider, you are essentially about to enter into a 'marriage' and it is important that you are right for each other!
Migration Solutions is a vendor independent computer room and data centre specialist company. Take a look at our website at http://www.migrationsolutions.com/
Labels:
computer room,
credit crunch,
Data Centre,
outsourcing
Wednesday, 8 April 2009
Metering the Data Centre
PUE, DCiE, what’s it all about? PUE is a metric developed by The Green Grid to measure Power Usage Effectiveness (PUE); DCiE (Data Centre infrastructure Efficiency) is simply the inverse of PUE reported as a percentage. OK, so now we are in recession. There are, and will be more, calls for spending cuts and more efficiency from existing hardware and our staff. PUE and DCiE can play an important part in this.
But where to start? As we are talking data centres, look at the power consumption. Or more accurately, look to see if you can look at the power consumption. It is amazing how many data centres and computer rooms, even the new builds don’t have metering installed to monitor power consumption. Data centres are estimated to contribute 3% of the CO2 emissions globally, yet the vast majority of data centre managers have no idea how much energy their facility consumes – let alone where to start making savings.
How do you get on with your company’s Facilities Manager? Ok, putting that aside, it’s imperative that there is a good working relationship between these vastly important departments (IT and Facilities) as these two hold the key to reducing energy consumption, and therefore costs, more than any other department.
Look at it from the Facility’s Managers point of view. He has little if any impact on what is installed in the data centre. All he or she will see is the monthly or quarterly electricity bills coming in with little idea of where to reduce costs, or indeed, where the costs are coming from. Keeping him/her in the picture is incredibly important.
With metering installed a whole range of other opportunities for savings is opened up. Chargeback for example. Facilities charge IT for power used, IT charge the business, whether on an application basic or per U basis. The method can be agreed, the important thing is that metering opens the doors to making the whole business aware of the true cost of powering the data centre. Metering at the rack or server level isn’t necessarily needed. That’s an additional expense and an overhead to monitor. Although it would be great, keep it simple to start.
Working together to install electricity meters to enable the PUE and DCiE to be calculated and logged on a regular basis is a start. It is also imperative to log your consumption regularly by taking meter readings and trending the power usage, what impacts it and what changes it.
How much will you save by installing these meters? Without proper metering, who knows?
Migration Solutions is a specialist computer room and data centre specialist offering independent advice on the design, build and operation of data centres and computer rooms. See our website at www.migrationsolutions.com, or email us at info@migrationsolutions.com.
But where to start? As we are talking data centres, look at the power consumption. Or more accurately, look to see if you can look at the power consumption. It is amazing how many data centres and computer rooms, even the new builds don’t have metering installed to monitor power consumption. Data centres are estimated to contribute 3% of the CO2 emissions globally, yet the vast majority of data centre managers have no idea how much energy their facility consumes – let alone where to start making savings.
How do you get on with your company’s Facilities Manager? Ok, putting that aside, it’s imperative that there is a good working relationship between these vastly important departments (IT and Facilities) as these two hold the key to reducing energy consumption, and therefore costs, more than any other department.
Look at it from the Facility’s Managers point of view. He has little if any impact on what is installed in the data centre. All he or she will see is the monthly or quarterly electricity bills coming in with little idea of where to reduce costs, or indeed, where the costs are coming from. Keeping him/her in the picture is incredibly important.
With metering installed a whole range of other opportunities for savings is opened up. Chargeback for example. Facilities charge IT for power used, IT charge the business, whether on an application basic or per U basis. The method can be agreed, the important thing is that metering opens the doors to making the whole business aware of the true cost of powering the data centre. Metering at the rack or server level isn’t necessarily needed. That’s an additional expense and an overhead to monitor. Although it would be great, keep it simple to start.
Working together to install electricity meters to enable the PUE and DCiE to be calculated and logged on a regular basis is a start. It is also imperative to log your consumption regularly by taking meter readings and trending the power usage, what impacts it and what changes it.
How much will you save by installing these meters? Without proper metering, who knows?
Migration Solutions is a specialist computer room and data centre specialist offering independent advice on the design, build and operation of data centres and computer rooms. See our website at www.migrationsolutions.com, or email us at info@migrationsolutions.com.
Labels:
charge back,
computer room,
Data Centre,
DCiE,
Facilities Manager,
metering,
PUE
Wednesday, 11 February 2009
Safety First
How safe is your data centre? A full populated 42U cabinet is 2.2 metres tall and IT servers can be 30kg. Would you lift the equivalent of half a teenager above your head without putting some kind of measures in place to protect yourself? Would you ask anyone else to do it for that matter? Health and Safety in the UK has become an area that businesses have to look at more and more carefully to protect their staff, their equipment, and themselves.
Data centres are dangerous places with high density power. Raised floors left open, leaving half a metre deep hole in the floor, are equally dangerous. In fact, there is virtually a trip hazard at every corner.
Do your staff know what to do in case of electric shock? Do your staff know how to lift a floor tile correctly? Is protective footwear used? How many times are removed floor tiles left at the side of of a gaping hole in the floor? Not only causing a trip a hazard, but a trip into the newly created floor void.
In 2007 35.3 in every 100,000 workers in the UK had a slip or trip injury at work. In an ideal world you would always have two people doing every physical job to minimise risk and strain but is this a practical measure?
What about lone working? Do you have man down alarms for lone workers? Do you allow lone working out of business hours?
Data centres are dangerous environments and they are relatively new to the employment world. HSE does cover working in them, but at the moment it seems that not enough data centre managers know their responsibilities as well as they should.
Migration Solutions are experienced data centre operators with a number staff working in a range of facilities in the UK. Migration Solutions also offers vendor independent consultancy and data centre migration.
Data centres are dangerous places with high density power. Raised floors left open, leaving half a metre deep hole in the floor, are equally dangerous. In fact, there is virtually a trip hazard at every corner.
Do your staff know what to do in case of electric shock? Do your staff know how to lift a floor tile correctly? Is protective footwear used? How many times are removed floor tiles left at the side of of a gaping hole in the floor? Not only causing a trip a hazard, but a trip into the newly created floor void.
In 2007 35.3 in every 100,000 workers in the UK had a slip or trip injury at work. In an ideal world you would always have two people doing every physical job to minimise risk and strain but is this a practical measure?
What about lone working? Do you have man down alarms for lone workers? Do you allow lone working out of business hours?
Data centres are dangerous environments and they are relatively new to the employment world. HSE does cover working in them, but at the moment it seems that not enough data centre managers know their responsibilities as well as they should.
Migration Solutions are experienced data centre operators with a number staff working in a range of facilities in the UK. Migration Solutions also offers vendor independent consultancy and data centre migration.
Labels:
computer room,
data centres,
Health,
HSE,
safety,
server
Friday, 30 January 2009
Mixed reaction to digital plans
Digital Britain, the publication by Lord Carter has been met with huge criticism from politicians and analysts alike. The report, an 86-page document on the future of UK broadband, internet regulation and public service broadcasting, has been described as "weak" and "bitterly disappointing". The public appears to have been looking forward to a document with a clear action plan for Britain’s' digital future, to provide the entire country with high speed internet and a gateway to improving our economy. The report "Digital Britain" highlights many areas in which the UK needs to improve its digital infrastructure to meet the technology demands of the next decade.
The introduction of digital television was one of the first steps taken into upgrading the nation’s infrastructure, but the increasing demand for Internet consumption has led to comparisons being made with other European countries and nations around the world. In Japan, for example, many new homes utilise fire optic technologies for running telephone, Internet and television connections which results in a better, faster service.
What does this mean for data centres? The future can only be positive for the industry as the world increases its reliance on the internet. Bigger connections will lead to increased use, and larger file sizes and as a result higher demand on public and private networks. Net books like the Eee PC and Mini Note have been designed specifically for Internet only use, and appear to be the future of computing if Google and Yahoo are to be believed. These companies along with the likes of Amazon are pushing the future of cloud computing which will require new data centres to be built, new servers being utilised and old data centres requiring a refit to become capable of handling these new technologies.
The new Digital Britain looks likely to feed a further increase in demand for data centres, both private (where storage requirements will continue to increase) and public (where increased reliance on the internet and the services provided will result in even heavier requirements than today).
Migration Solutions are data centre specialists, providing truly independent and impartial advice to customers from all sectors of industry. Visit www.migrationsolutions.com for more about the company and services that we offer.
The introduction of digital television was one of the first steps taken into upgrading the nation’s infrastructure, but the increasing demand for Internet consumption has led to comparisons being made with other European countries and nations around the world. In Japan, for example, many new homes utilise fire optic technologies for running telephone, Internet and television connections which results in a better, faster service.
What does this mean for data centres? The future can only be positive for the industry as the world increases its reliance on the internet. Bigger connections will lead to increased use, and larger file sizes and as a result higher demand on public and private networks. Net books like the Eee PC and Mini Note have been designed specifically for Internet only use, and appear to be the future of computing if Google and Yahoo are to be believed. These companies along with the likes of Amazon are pushing the future of cloud computing which will require new data centres to be built, new servers being utilised and old data centres requiring a refit to become capable of handling these new technologies.
The new Digital Britain looks likely to feed a further increase in demand for data centres, both private (where storage requirements will continue to increase) and public (where increased reliance on the internet and the services provided will result in even heavier requirements than today).
Migration Solutions are data centre specialists, providing truly independent and impartial advice to customers from all sectors of industry. Visit www.migrationsolutions.com for more about the company and services that we offer.
Labels:
computer room,
data centres,
digital britain,
internet
Subscribe to:
Posts (Atom)